Buying a New Build or Off-Plan Home in Spain: Payment Guarantees, VAT, Defects Cover and Snagging
Updated 7 November 2026 · 7 min read
Flat Spain's guide: a new home in Spain is taxed differently from a resale, with 10% VAT plus a regional stamp duty of roughly 0.5% to 1.5% instead of transfer tax. If you buy off-plan, the law requires the developer to guarantee the payments you make before handover with a bank guarantee or an insurance policy, paid into a special account and refundable with legal interest if the home is not built or delivered, but only money paid after the building licence was granted is covered, so keep anything before that to a small reservation. After handover the builders answer for defects for one year (finishes), three years (habitability) and ten years (structure), and the developer must insure the structure for the ten years.
New build or resale: the costs
| Item | New build | Resale |
|---|---|---|
| Main tax | 10% VAT | Transfer tax (ITP), 6% to 10% by region |
| Stamp duty (AJD) | Roughly 0.5% to 1.5% by region | None on the purchase itself |
| Canary Islands | IGIC instead of VAT | Transfer tax, as elsewhere |
| Notary, registry and lawyer | Similar | Similar |
| Defects | Legal cover for 1, 3 and 10 years | Hidden defects claimable against the seller within six months |
Taxes and protections on a new build and a resale home in Spain, 2027
Paying for an off-plan home
An off-plan home is paid for in stages, in the order below. Ask for the guarantee certificate before every payment: money paid before the building licence was granted falls outside the statutory guarantee, which is why a reservation should stay small until the licence exists.
- 1Reservation: a small sum to take the unit off the market, usually a few thousand euros
- 2Private purchase contract: commonly 10% to 30% of the price, paid in stages during construction
- 3Each stage paid into the development's special account, with an individual certificate of the bank guarantee or insurance that covers it
- 4Completion: the balance at the notary, once the building has its first-occupation licence or the regional equivalent
If the developer is late or fails
If construction does not start, or the home is not delivered by the agreed date, the buyer can end the contract and claim the payments back from the guarantor with legal interest. Read the delivery clause before you sign: a contract with no firm date, or one the developer can extend at will, weakens that right.
Defects after you move in
| Period | Covers | Who answers |
|---|---|---|
| 1 year | Finishing defects: tiles, paint, doors, fittings | The builder |
| 3 years | Defects in installations or elements that break habitability: damp, plumbing, insulation | The developer, with the builder and technical team for their part |
| 10 years | Structural damage: foundations, beams, load-bearing walls | The developer, backed by compulsory ten-year insurance (seguro decenal) |
Liability for defects in a new home under the Building Act (Ley 38/1999, article 17)
Snagging and handover
- Inspect before the notary: walk the home with a snagging list, test every tap, socket, window and shutter, and photograph everything
- Send the list to the developer in writing before completion, with a deadline to fix it
- Check the paperwork: the first-occupation licence or responsible declaration, the energy certificate, the ten-year insurance policy, and the registered division of the building into units
- A retention on the price for listed defects can be negotiated; do not pay the balance for unfinished work
Is the price right?
New homes list at a premium over the same street's resales. The Flat Spain Price Benchmark allows for that premium when Flat Spain's investor desk compares a listing with its area, so a new flat is judged against new flats rather than against fifty-year-old stock.
Frequently asked questions
Is buying off-plan in Spain safe?
Safer than it was: the developer must guarantee your payments with a bank or insurer and refund them with legal interest if the home is not built or delivered. The cover applies to money paid after the building licence, so ask for a guarantee certificate for every payment.
What tax do you pay on a new build in Spain?
10% VAT plus a regional stamp duty of roughly 0.5% to 1.5%, instead of the transfer tax paid on resales. In the Canary Islands, IGIC replaces VAT.
How long is a new build guaranteed in Spain?
By law, one year for finishing defects, three years for defects that affect habitability, and ten years for structural damage, which the developer must insure.
What is snagging when buying a new home in Spain?
Inspecting the home before completion and listing every defect for the developer to fix, ideally before you sign at the notary.